WIN releases feasibility study
The problem
Stage one of the project involved identifying water problems on various farms, making a list of the problems and brainstorming potential innovative solutions. This stage was very much about thinking big and not limiting our options.
The initial phase of stage two involved a feasibility study. The feasibility study was about narrowing down the long list of ideas from stage one to identify a select number of trials which can be run on the selected farms.
As part of the feasibility study a number of sites visits were conducted by our expert sub-contractor consortium. The findings are presented in the document below.